Selected project

Floating wind transport and installation engineering

Transport and installation engineering for floating wind turbines.

Floating offshore wind foundation under tow
Client profile
Offshore structures contractor
Region
Europe
Year
2023–2024
Project stage
Transport & installation
The context

Understanding
the assignment.

Nautilus Dynamics teams supported a floating wind development through integrated transport and installation engineering, from marine analysis and mooring arrangements to drawings and offshore support.

Challenges

  • Connect float-off, ballasting, towing, pre-lay and hook-up as successive engineering stages.
  • Carry berth requirements and operational limits into mobilisation and offshore preparation.
Nautilus Dynamics’ contribution

Our engineering scope.

  • Float-off and ballasting, towing and seafastening analysis.
  • Mooring pre-lay and hook-up analysis.
  • Berthing analysis, layouts, specifications and follow-up.
  • Mobilisation and offshore support, including operational limit extension studies.
  • 2D drafting, 3D modelling, fabrication drawings and visual material.
Work with Nautilus

Let’s talk about your project.

Tell us about the engineering challenge, the location and your schedule. We’ll connect you with the right people.

Discuss your project