Selected project

FPSO installation engineering and chute design

Installation engineering, chute design and construction follow-up for an FPSO operation.

Installation frame positioned alongside a vessel
Client profile
Independent energy operator
Region
Africa & Middle East
Year
2025
Project stage
Design & installation support
The context

Understanding
the assignment.

Nautilus Dynamics teams combined installation analysis, chute design and site inspection within an integrated offshore engineering scope.

Challenges

  • Coordinate rigging, seafastening and chute design around the installation sequence.
  • Keep calculations, fabrication drawings and site follow-up aligned with the project’s time and budget constraints.
Nautilus Dynamics’ contribution

Our engineering scope.

  • Feasibility, installation analyses and procedures.
  • Rigging verification and seafastening design.
  • Chute structural design, finite element analysis, weld and bolting checks.
  • Fabrication drawings and installation sequence visualisation.
  • Site and construction inspection, chute installation and fabrication follow-up.